This Old House
Saratoga Springs: Watertight Doghouse Dormers
Running new water and sewer lines; the house is brought up to code with fire sprinklers; doghouse dormers are made watertight. (30 minutes)
Can't find the episode you're looking for?
Running new water and sewer lines; the house is brought up to code with fire sprinklers; doghouse dormers are made watertight. (30 minutes)
Can't find the episode you're looking for?
Tue, 4/29 at 3:00 am on Austin PBS Create
The installation of the new septic system; repairing the portion of the staircase that was burned in the fire; rough plumbing. (30 minutes)
Tue, 4/29 at 8:00 pm on Austin PBS Create
Plans to design the perfect HVAC system; how fire moves through balloon framed houses. (30 minutes)
Wed, 4/30 at 1:00 am on Austin PBS Create
Plans to design the perfect HVAC system; how fire moves through balloon framed houses. (30 minutes)
Wed, 4/30 at 8:00 pm on Austin PBS Create
Restoring the main staircase; a visit to an orchard; installing a roof hatch to the widow's walk. (30 minutes)
Thu, 5/1 at 1:00 am on Austin PBS Create
Restoring the main staircase; a visit to an orchard; installing a roof hatch to the widow's walk. (30 minutes)
Thu, 5/1 at 8:00 pm on Austin PBS Create
The installation of the new septic system; repairing the portion of the staircase that was burned in the fire; rough plumbing. (30 minutes)
Fri, 5/2 at 1:00 am on Austin PBS Create
The installation of the new septic system; repairing the portion of the staircase that was burned in the fire; rough plumbing. (30 minutes)
Fri, 5/2 at 3:00 am on Austin PBS Create
Hand-patching sidewall shingles; installing ductwork for the hydronic heating and cooling system; finishing up the rough electrical with dimmable LED recessed lighting; installing a pocket door kit. (30 minutes)
Fri, 5/2 at 7:00 am on Austin PBS Create
The installation of the new septic system; repairing the portion of the staircase that was burned in the fire; rough plumbing. (30 minutes)
Fri, 5/2 at 1:00 pm on Austin PBS Create
The installation of the new septic system; repairing the portion of the staircase that was burned in the fire; rough plumbing. (30 minutes)
Sat, 5/3 at 3:00 am on Austin PBS Create
The installation of the new septic system; repairing the portion of the staircase that was burned in the fire; rough plumbing. (30 minutes)